Land Development Review - Wet Pond as-Built Plan Checklist is a legal document that was released by the Storm Water Services - City of Charlotte, North Carolina - a government authority operating within North Carolina. The form may be used strictly within City of Charlotte.
Q: What is a wet pond as-built plan?
A: A wet pond as-built plan is a plan that shows the actual construction details of a wet pond after it has been completed.
Q: Why is a wet pond as-built plan required?
A: A wet pond as-built plan is required to ensure that the wet pond has been constructed correctly and in compliance with the city's regulations.
Q: What should be included in a wet pond as-built plan?
A: A wet pond as-built plan should include details such as the dimensions and elevation of the pond, the location of inlets and outlets, and the type of vegetation used.
Q: Who is responsible for preparing the wet pond as-built plan?
A: The developer or contractor who constructs the wet pond is responsible for preparing the as-built plan.
Q: Is there a checklist available for the wet pond as-built plan in the City of Charlotte?
A: Yes, the City of Charlotte provides a checklist that outlines the required information and documents for the wet pond as-built plan.
Form Details:
Download a printable version of the form by clicking the link below or browse more documents and templates provided by the Storm Water Services - City of Charlotte, North Carolina.