DD Form 218-1 Telephone Directory Classified Section Change Order

DD Form 218-1 Telephone Directory Classified Section Change Order

What Is DD Form 218-1?

This is a form that was released by the U.S. Department of Defense (DoD) on February 1, 1966. The form, often mistakenly referred to as the DA Form 218-1, is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DoD.

Form Details:

  • A 2-page document available for download in PDF;
  • The latest version available from the Executive Services Directorate;
  • Additional instructions and information can be found on page 2 of the document;
  • Editable, printable, and free to use;
  • Fill out the form in our online filing application.

Download an up-to-date fillable DD Form 218-1 down below in PDF format or browse hundreds of other DoD Forms compiled in our online library.

ADVERTISEMENT

Download DD Form 218-1 Telephone Directory Classified Section Change Order

4.6 of 5 (33 votes)
  • DD Form 218-1 Telephone Directory Classified Section Change Order

    1

  • DD Form 218-1 Telephone Directory Classified Section Change Order, Page 2

    2

  • DD Form 218-1 Telephone Directory Classified Section Change Order, Page 1
  • DD Form 218-1 Telephone Directory Classified Section Change Order, Page 2
Prev12Next
ADVERTISEMENT