Notification of on-Site Plan Coordinator Under General Permit 3-9020 - Vermont

Notification of on-Site Plan Coordinator Under General Permit 3-9020 - Vermont

Notification of on-Site Plan Coordinator Under General Permit 3-9020 is a legal document that was released by the Vermont Department of Environmental Conservation - a government authority operating within Vermont.

FAQ

Q: What is General Permit 3-9020 in Vermont?
A: General Permit 3-9020 is a permit issued in Vermont for certain construction activities that could impact water quality.

Q: What is an on-site plan coordinator?
A: An on-site plan coordinator is a person designated to oversee and manage the implementation of the erosion control plan for a construction site.

Q: Why is notification of an on-site plan coordinator required?
A: Notification of an on-site plan coordinator is required to ensure that the designated person is aware of their responsibilities and can effectively carry out erosion control measures.

Q: What are the duties of an on-site plan coordinator?
A: The duties of an on-site plan coordinator include implementing and maintaining erosion control measures, conducting regular site inspections, and coordinating with construction personnel to minimize sediment runoff.

Q: Who needs to be notified about the on-site plan coordinator?
A: The Vermont Agency of Natural Resources needs to be notified about the designated on-site plan coordinator.

Q: What information is required in the notification form?
A: The notification form typically requires information such as the project location, name and contact information of the on-site plan coordinator, and a brief description of the construction activities.

Q: Are there any fees associated with the notification?
A: There are no fees associated with notifying the Agency of Natural Resources about the on-site plan coordinator.

Q: What happens after submitting the notification form?
A: After submitting the notification form, the Agency of Natural Resources will review the information and may follow up with additional instructions or requirements.

Q: Are there any penalties for not complying with the notification requirement?
A: Failure to comply with the notification requirement may result in penalties and enforcement actions by the Agency of Natural Resources.

ADVERTISEMENT

Form Details:

  • The latest edition currently provided by the Vermont Department of Environmental Conservation;
  • Ready to use and print;
  • Easy to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of the form by clicking the link below or browse more documents and templates provided by the Vermont Department of Environmental Conservation.

Download Notification of on-Site Plan Coordinator Under General Permit 3-9020 - Vermont

4.4 of 5 (7 votes)
  • Notification of on-Site Plan Coordinator Under General Permit 3-9020 - Vermont, Page 1
ADVERTISEMENT

Related Documents