This is a legal form that was released by the Washington State Department of Health - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is DOH Form 337-085 for?
A: DOH Form 337-085 is a checklist for the engineering report of large on-site sewage systems (LOSS) in Washington.
Q: Who uses DOH Form 337-085?
A: Engineers and professionals involved in designing and reporting on large on-site sewage systems in Washington use DOH Form 337-085.
Q: What is the purpose of the checklist?
A: The checklist helps ensure that the engineering report for large on-site sewage systems meets the requirements and standards set by the Department of Health (DOH) in Washington.
Q: What should be included in the engineering report?
A: The engineering report should include site information, system design details, construction and installation information, and any additional required documentation.
Q: What happens after completing the checklist?
A: After completing the checklist, the engineering report along with the checklist should be submitted to the Department of Health for review and approval.
Form Details:
Download a printable version of DOH Form 337-085 by clicking the link below or browse more documents and templates provided by the Washington State Department of Health.