This is a legal form that was released by the Florida Department of Environmental Protection - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is DEP Form 62-621.300(3)(B)?
A: DEP Form 62-621.300(3)(B) is a form used in Florida for submitting a Notice of Intent to Use Generic Permit for Discharges From Concrete Batch Plants.
Q: What is the purpose of DEP Form 62-621.300(3)(B)?
A: The purpose of DEP Form 62-621.300(3)(B) is to provide notification to the Department of Environmental Protection (DEP) in Florida about the intent to use a generic permit for discharges from concrete batch plants.
Q: Who is required to submit DEP Form 62-621.300(3)(B)?
A: Concrete batch plant operators in Florida who wish to use a generic permit for discharges are required to submit DEP Form 62-621.300(3)(B).
Q: What does the generic permit for discharges from concrete batch plants cover?
A: The generic permit for discharges from concrete batch plants in Florida covers the discharge of process wastewater and stormwater from the concrete batching process.
Form Details:
Download a fillable version of DEP Form 62-621.300(3)(B) by clicking the link below or browse more documents and templates provided by the Florida Department of Environmental Protection.