Industrial Stormwater General Permit - Annual Comprehensive Industrial Stormwater Activity) is a legal document that was released by the Mississippi Department of Environmental Quality - a government authority operating within Mississippi.
Q: What is the Industrial Stormwater General Permit?
A: The Industrial Stormwater General Permit is a permit issued by the state of Mississippi that regulates stormwater discharges from industrial facilities.
Q: What is an Annual Comprehensive Site Inspection?
A: An Annual Comprehensive Site Inspection is a thorough inspection of an industrial site to assess compliance with stormwater management requirements.
Q: What is an SWPPP?
A: SWPPP stands for Stormwater PollutionPrevention Plan. It is a document that outlines how an industrial facility will prevent stormwater pollution.
Q: What is the purpose of the Annual Comprehensive Site Inspection and SWPPP Evaluation Report?
A: The purpose of this report is to evaluate the effectiveness of the facility's SWPPP and to document any deficiencies or areas of non-compliance.
Q: Who is required to submit this report?
A: Industrial facilities with stormwater discharges in Mississippi are required to submit this report annually.
Q: What should be included in the report?
A: The report should include details of the site inspection, evaluation of the SWPPP, identification of any deficiencies, and corrective actions taken or planned.
Q: Who enforces the requirements of the Industrial Stormwater General Permit?
A: The Mississippi Department of Environmental Quality (MDEQ) enforces the requirements of the Industrial Stormwater General Permit.
Q: What are the consequences of non-compliance?
A: Non-compliance with the Industrial Stormwater General Permit can result in penalties, fines, or enforcement actions by the MDEQ.
Form Details:
Download a printable version of the form by clicking the link below or browse more documents and templates provided by the Mississippi Department of Environmental Quality.