Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska

Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska

What Is Form 25D-203?

This is a legal form that was released by the Alaska Department of Transportation and Public Facilities - a government authority operating within Alaska. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form 25D-203?
A: Form 25D-203 is a document used for supplier-submitted concrete mix designs in Alaska.

Q: Who completes Form 25D-203?
A: Suppliers complete Form 25D-203 to submit their concrete mix designs.

Q: What is a concrete mix design?
A: A concrete mix design is a specific combination of ingredients and proportions that results in a desired concrete strength and durability.

Q: Why is Form 25D-203 important?
A: Form 25D-203 is important because it ensures that the concrete mix design meets the required specifications and standards for construction projects in Alaska.

Q: Are suppliers required to submit Form 25D-203 for all concrete mixes?
A: Yes, suppliers are required to submit Form 25D-203 for all concrete mixes that will be used in Alaska.

Q: Who reviews Form 25D-203?
A: Form 25D-203 is reviewed by the appropriate authorities or agencies responsible for overseeing construction projects in Alaska.

Q: What happens if the concrete mix design does not meet the required specifications?
A: If the concrete mix design does not meet the required specifications, it may be rejected and the supplier will need to revise and resubmit the design.

Q: Can suppliers make changes to a submitted concrete mix design?
A: Yes, suppliers can make changes to a submitted concrete mix design, but the revised design must be resubmitted for review and approval.

Q: How long does the review process take for Form 25D-203?
A: The length of the review process for Form 25D-203 can vary depending on the workload of the reviewing authorities or agencies.

Q: Can suppliers start using a concrete mix before it is approved?
A: No, suppliers should not start using a concrete mix before it is approved through the Form 25D-203 process.

ADVERTISEMENT

Form Details:

  • Released on May 1, 2020;
  • The latest edition provided by the Alaska Department of Transportation and Public Facilities;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form 25D-203 by clicking the link below or browse more documents and templates provided by the Alaska Department of Transportation and Public Facilities.

Download Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska

4.4 of 5 (5 votes)
  • Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska

    1

  • Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska, Page 2

    2

  • Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska, Page 1
  • Form 25D-203 Supplier Submitted Concrete Mix Design - Alaska, Page 2
Prev 1 2 Next
ADVERTISEMENT