Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah

Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah

What Is Form DDW-Eng-0017?

This is a legal form that was released by the Utah Department of Environmental Quality - a government authority operating within Utah. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form DDW-Eng-0017?
A: Form DDW-Eng-0017 is a document used for the plan review of a surface water treatment plant in Utah.

Q: What is the purpose of the plan review?
A: The purpose of the plan review is to ensure that the surface water treatment plant meets regulatory requirements.

Q: Who is responsible for conducting the plan review?
A: The plan review is conducted by the Utah Division of Drinking Water.

Q: What is a surface water treatment plant?
A: A surface water treatment plant is a facility that treats water from natural sources such as rivers, lakes, or reservoirs for public consumption.

Q: Why is the plan review necessary?
A: The plan review is necessary to ensure that the surface water treatment plant is designed and constructed properly to provide safe and clean drinking water to the public.

Q: What does the plan review process involve?
A: The plan review process involves reviewing the design plans, specifications, and other documents related to the surface water treatment plant.

Q: Are there any fees associated with the plan review?
A: Yes, there may be fees associated with the plan review. The specific fees can be found in the fee schedule provided by the Utah Division of Drinking Water.

Q: How long does the plan review process take?
A: The duration of the plan review process can vary depending on the complexity of the project. It is recommended to contact the Utah Division of Drinking Water for more information on the timeline.

Q: What happens after the plan review is completed?
A: After the plan review is completed, the Utah Division of Drinking Water will provide feedback and recommendations to the applicant to ensure compliance with the regulatory requirements.

Q: Is the plan review mandatory for all surface water treatment plants in Utah?
A: Yes, the plan review is mandatory for all surface water treatment plants in Utah to ensure the safety and quality of the drinking water supply.

ADVERTISEMENT

Form Details:

  • Released on June 5, 2020;
  • The latest edition provided by the Utah Department of Environmental Quality;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form DDW-Eng-0017 by clicking the link below or browse more documents and templates provided by the Utah Department of Environmental Quality.

Download Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah

4.5 of 5 (18 votes)
  • Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah

    1

  • Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah, Page 2

    2

  • Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah, Page 1
  • Form DDW-Eng-0017 Plan Review of Surface Water Treatment Plant - Utah, Page 2
Prev 1 2 Next
ADVERTISEMENT