This is a legal form that was released by the Illinois Department of Transportation - a government authority operating within Illinois. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is AER27?
A: AER27 is a Quality Control Plan for Hot Mix Asphalt (HMA) in Illinois.
Q: What does AER27 cover?
A: AER27 covers the quality control procedures for HMA production and placement.
Q: What is the purpose of AER27?
A: The purpose of AER27 is to ensure that HMA meets specified quality requirements and performs satisfactorily in the field.
Q: Who is responsible for implementing AER27?
A: The contractor is responsible for implementing AER27 and performing quality control activities.
Q: What are some of the quality control activities covered in AER27?
A: Some of the quality control activities covered in AER27 include testing of materials, sampling and testing of HMA, and documentation of test results.
Q: Who provides oversight of the quality control activities?
A: The Illinois Department of Transportation (IDOT) provides oversight of the quality control activities through inspections and audits.
Form Details:
Download a fillable version of Form AER27 by clicking the link below or browse more documents and templates provided by the Illinois Department of Transportation.