This version of the form is not currently in use and is provided for reference only. Download this version of ADEM Form 558 for the current year.
This is a legal form that was released by the Alabama Department of Environmental Management - a government authority operating within Alabama. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is the ADEM Form 558?
A: ADEM Form 558 is a 30 Day Walkthrough Inspection Checklist Log used in Alabama.
Q: What is the purpose of ADEM Form 558?
A: The purpose of ADEM Form 558 is to document and track the inspection of a facility within 30 days of permit issuance.
Q: Who uses ADEM Form 558?
A: ADEM Form 558 is used by facility operators in Alabama.
Q: When should the 30 Day Walkthrough Inspection be conducted?
A: The 30 Day Walkthrough Inspection should be conducted within 30 days of permit issuance.
Q: What information is recorded on ADEM Form 558?
A: ADEM Form 558 records information such as facility details, inspection dates, findings, and corrective actions.
Q: Is ADEM Form 558 mandatory?
A: Yes, ADEM Form 558 is a mandatory requirement for facility operators in Alabama.
Form Details:
Download a printable version of ADEM Form 558 by clicking the link below or browse more documents and templates provided by the Alabama Department of Environmental Management.