Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia

Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia

FAQ

Q: What is Form 71 Fire Hydrant and Sprinkler System Commissioning?
A: Form 71 Fire Hydrant and Sprinkler System Commissioning is a document used in Queensland, Australia to verify the proper functioning of fire hydrant and sprinkler systems.

Q: Who is responsible for completing Form 71?
A: The installing contractor is responsible for completing Form 71.

Q: Why is Form 71 important?
A: Form 71 ensures that fire hydrant and sprinkler systems are working correctly and are ready to operate in case of a fire emergency.

Q: When should Form 71 be completed?
A: Form 71 should be completed after the installation of fire hydrant and sprinkler systems and before the building is occupied.

Q: Who needs to receive a copy of Form 71?
A: A copy of Form 71 must be provided to the building owner, local fire authority, and the Queensland Building and Construction Commission.

ADVERTISEMENT

Download Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia

4.5 of 5 (26 votes)
  • Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia

    1

  • Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia, Page 2

    2

  • Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia, Page 1
  • Form 71 Fire Hydrant and Sprinkler System Commissioning - Queensland, Australia, Page 2
Prev 1 2 Next
ADVERTISEMENT