Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania

Notification Icon This version of the form is not currently in use and is provided for reference only. Download this version of Form CS-704 for the current year.

Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania

What Is Form CS-704?

This is a legal form that was released by the Pennsylvania Department of Transportation - a government authority operating within Pennsylvania. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form CS-704?
A: Form CS-704 is the Minimum Quality Control Plan for Field Placement Concrete Operations.

Q: What is the purpose of Form CS-704?
A: The purpose of Form CS-704 is to provide guidelines and requirements for ensuring quality control in field placement concrete operations.

Q: Which state does Form CS-704 apply to?
A: Form CS-704 applies to concrete operations in the state of Pennsylvania.

Q: What does the form cover?
A: The form covers minimum requirements for concrete mix design, handling, placement, curing, testing, and inspection.

Q: Who should use Form CS-704?
A: Form CS-704 should be used by contractors, engineers, and other professionals involved in field placement concrete operations in Pennsylvania.

Q: What happens if the requirements in Form CS-704 are not followed?
A: Failure to comply with the requirements in Form CS-704 may result in quality issues, project delays, or penalties.

Q: Are there any exemptions to using Form CS-704?
A: There may be exemptions or alternative quality control plans allowed on a case-by-case basis, subject to approval.

Q: Is Form CS-704 applicable to all concrete operations?
A: Yes, Form CS-704 is applicable to all field placement concrete operations conducted in Pennsylvania.

Q: What should be included in the quality control plan?
A: The quality control plan should include details on mix design, materials, testing procedures, inspection methods, and documentation requirements.

Q: Is Form CS-704 a legally binding document?
A: Form CS-704 is a regulatory document that outlines the minimum requirements for quality control in concrete operations.

Q: Can additional quality control measures be implemented?
A: Yes, additional quality control measures can be implemented as long as they meet or exceed the requirements outlined in Form CS-704.

Q: Who is responsible for implementing the quality control plan?
A: Contractors and concrete operation professionals are responsible for implementing and adhering to the quality control plan.

Q: What are the consequences of non-compliance with Form CS-704?
A: Non-compliance with Form CS-704 may lead to project rejections, required rework, or potential legal consequences.

Q: Is training required for personnel involved in concrete operations?
A: Yes, personnel involved in concrete operations should receive appropriate training to ensure compliance with Form CS-704 and safety guidelines.

Q: Can Form CS-704 be modified or customized?
A: Form CS-704 can be modified or customized as long as the minimum requirements and guidelines for quality control are maintained.

Q: What other resources are available for concrete operations in Pennsylvania?
A: In addition to Form CS-704, there may be other resources such as guidelines, specifications, and industry best practices available.

Q: Is there a review or approval process for the quality control plan?
A: Yes, the quality control plan may be subject to review and approval by relevant authorities or regulatory agencies.

Q: What should be done if there are deviations from the quality control plan?
A: Any deviations from the quality control plan should be documented, evaluated, and appropriate corrective actions should be taken.

Q: Is compliance with Form CS-704 mandatory or voluntary?
A: Compliance with Form CS-704 is mandatory for all field placement concrete operations in Pennsylvania.

Q: Are there any penalties for non-compliance with Form CS-704?
A: Penalties for non-compliance with Form CS-704 may vary and can include warnings, fines, or project suspensions.

ADVERTISEMENT

Form Details:

  • Released on December 1, 2019;
  • The latest edition provided by the Pennsylvania Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form CS-704 by clicking the link below or browse more documents and templates provided by the Pennsylvania Department of Transportation.

Download Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania

4.4 of 5 (13 votes)
  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania

    1

  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 2

    2

  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 3

    3

  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 4

    4

  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 5

    5

  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 1
  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 2
  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 3
  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 4
  • Form CS-704 Minimum Quality Control Plan for Field Placement Concrete Operations - Pennsylvania, Page 5
Prev 1 2 3 4 5 Next
ADVERTISEMENT