This is a legal form that was released by the Iowa Department of Natural Resources - a government authority operating within Iowa. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is DNR Form 542-0955?
A: DNR Form 542-0955 is an Air QualityConstruction Permit application form.
Q: What is a Group 2 Grain Elevator?
A: A Group 2 Grain Elevator refers to a specific type of grain elevator that is categorized as such for regulatory purposes.
Q: What is an Air Quality Construction Permit?
A: An Air Quality Construction Permit is a permit required for construction activities that may affect air quality.
Q: Who needs to apply for this permit?
A: Owners or operators of Group 2 Grain Elevators in Iowa need to apply for this permit.
Q: What is the purpose of this permit?
A: The purpose of this permit is to regulate and ensure compliance with air quality standards during construction activities at grain elevators.
Form Details:
Download a fillable version of DNR Form 542-0955 by clicking the link below or browse more documents and templates provided by the Iowa Department of Natural Resources.