This is a legal form that was released by the Texas Department of Licensing and Regulation - a government authority operating within Texas. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is Form IHB057?
A: Form IHB057 is the Alteration Transmittal Form for Industrialized Housing and Permanent Industrialized Buildings in Texas.
Q: What is an industrialized housing?
A: Industrialized housing refers to factory-built homes that are constructed to meet specific standards set by the state.
Q: What is a permanent industrialized building?
A: A permanent industrialized building refers to a structure that is factory-built and designed for permanent installation on a site.
Q: What is the purpose of Form IHB057?
A: Form IHB057 is used to request approval for alterations or modifications to industrialized housing or permanent industrialized buildings.
Q: Who needs to complete Form IHB057?
A: The owner or authorized representative of the industrialized housing or permanent industrialized building needs to complete Form IHB057.
Q: What documents need to be submitted with Form IHB057?
A: The required documents may vary depending on the specific alteration or modification being requested. It is best to refer to the instructions provided with Form IHB057.
Q: How long does it take to process Form IHB057?
A: The processing time for Form IHB057 may vary. It is recommended to contact the TDLR directly for information on the current processing times.
Form Details:
Download a printable version of TDLR Form IHB057 by clicking the link below or browse more documents and templates provided by the Texas Department of Licensing and Regulation.