Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington

Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington

What Is Form ECY050-1-21B?

This is a legal form that was released by the Washington State Department of Ecology - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is Form ECY050-1-21B?
A: Form ECY050-1-21B is an application for Well Construction Operator Training License - Resource Protection or Water Well in Washington.

Q: What is the purpose of Form ECY050-1-21B?
A: The purpose of Form ECY050-1-21B is to apply for a Well Construction Operator Training License - Resource Protection or Water Well in Washington.

Q: Who needs to fill out Form ECY050-1-21B?
A: Anyone who wishes to obtain a Well Construction Operator Training License - Resource Protection or Water Well in Washington needs to fill out Form ECY050-1-21B.

Q: Is there a fee for submitting Form ECY050-1-21B?
A: Yes, there is a fee associated with submitting Form ECY050-1-21B. The fee amount can be found on the application form.

Q: What types of Well Construction Operator Training Licenses are available in Washington?
A: There are two types of Well Construction Operator Training Licenses available in Washington - Resource Protection and Water Well.

Q: What is the difference between a Resource Protection and a Water Well license?
A: A Resource Protection license is for those who plan to construct or abandon wells that are used for geotechnical, environmental, or dewatering purposes. A Water Well license is for those who plan to construct or abandon wells that are used for water supply purposes.

Q: Are there any prerequisites for obtaining a Well Construction Operator Training License?
A: Yes, there are prerequisites for obtaining a Well Construction Operator Training License. These prerequisites include completing an approved training course, passing an examination, and meeting certain experience requirements.

Q: How long does it take to process Form ECY050-1-21B?
A: The processing time for Form ECY050-1-21B can vary. It is recommended to submit the application well in advance to allow for processing time.

ADVERTISEMENT

Form Details:

  • Released on April 1, 2014;
  • The latest edition provided by the Washington State Department of Ecology;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form ECY050-1-21B by clicking the link below or browse more documents and templates provided by the Washington State Department of Ecology.

Download Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington

4.7 of 5 (39 votes)
  • Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington

    1

  • Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington, Page 2

    2

  • Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington, Page 1
  • Form ECY050-1-21B Application for Well Construction Operator Training License - Resource Protection or Water Well - Washington, Page 2
Prev 1 2 Next
ADVERTISEMENT