This is a legal form that was released by the Washington State Department of Ecology - a government authority operating within Washington. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is Form ECY070-328?
A: Form ECY070-328 is an application for a general order for portable and stationary concrete batch plants in the state of Washington.
Q: What is a general order?
A: A general order is a permit that allows certain activities to be conducted without the need for an individual permit.
Q: What is a portable concrete batch plant?
A: A portable concrete batch plant is a mobile plant that can be easily transported to different locations.
Q: What is a stationary concrete batch plant?
A: A stationary concrete batch plant is a plant that is set up in a permanent location and cannot be easily moved.
Q: Why is a general order required for concrete batch plants?
A: A general order is required to ensure that concrete batch plants meet certain environmental regulations and standards.
Q: What are the environmental regulations for concrete batch plants in Washington?
A: The specific environmental regulations for concrete batch plants in Washington are outlined in the form ECY070-328.
Q: Are there any fees associated with the application?
A: Yes, there are fees associated with the application. The amount of the fees can be found on the application form.
Q: Is there a deadline for submitting the application?
A: Yes, there is a deadline for submitting the application. The deadline is typically specified on the application form.
Q: Who is responsible for reviewing and approving the application?
A: The Washington Department of Ecology is responsible for reviewing and approving the application.
Form Details:
Download a fillable version of Form ECY070-328 by clicking the link below or browse more documents and templates provided by the Washington State Department of Ecology.