This is a legal form that was released by the U.S. Air Force IMT (Information Management Tool) on March 1, 1991 and used country-wide. As of today, no separate filing guidelines for the form are provided by the issuing department.
Q: What is AF IMT Form 3509?
A: AF IMT Form 3509 is the Daily Power Plant Operating Log for Gas Turbine - Electric.
Q: What is the purpose of AF IMT Form 3509?
A: The purpose of AF IMT Form 3509 is to record daily operations and maintenance details of a gas turbine power plant.
Q: Who uses AF IMT Form 3509?
A: AF IMT Form 3509 is used by power plant operators and maintenance personnel.
Q: What information is recorded in AF IMT Form 3509?
A: AF IMT Form 3509 records information such as operating hours, fuel consumption, maintenance activities, and any abnormal occurrences.
Q: Is AF IMT Form 3509 specific to gas turbine power plants?
A: Yes, AF IMT Form 3509 is specific to gas turbine power plants.
Q: Is AF IMT Form 3509 required by regulations?
A: Yes, AF IMT Form 3509 may be required by regulations for documentation and reporting purposes.
Form Details:
Download a fillable version of AF IMT Form 3509 by clicking the link below or browse more documents and templates provided by the U.S. Air Force IMT (Information Management Tool).