Form 650-040-07 Contractor / Subcontractor Certification Npdes Generic Permit for Storm Water Discharges From Large and Small Construction Activities - Florida

Form 650-040-07 Contractor / Subcontractor Certification Npdes Generic Permit for Storm Water Discharges From Large and Small Construction Activities - Florida

What Is Form 650-040-07?

This is a legal form that was released by the Florida Department of Transportation - a government authority operating within Florida. As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is the purpose of Form 650-040-07?
A: To certify compliance with storm water discharge regulations for construction activities in Florida.

Q: What is NPDES?
A: NPDES stands for National Pollutant Discharge Elimination System, which is a program that regulates pollutant discharges into the waters of the United States.

Q: What is a generic permit?
A: A generic permit is a standardized permit that regulates a specific type of activity, such as storm water discharges from construction sites.

Q: What is the difference between large and small construction activities?
A: Large construction activities typically involve projects that disturb 5 acres or more of land, while small construction activities disturb less than 5 acres.

Q: Who needs to submit Form 650-040-07?
A: Contractors and subcontractors involved in construction activities that require compliance with storm water discharge regulations in Florida.

Q: What information is required in the form?
A: The form requires information about the contractor or subcontractor, project location, and certification of compliance with storm water discharge regulations.

Q: Are there any fees associated with submitting Form 650-040-07?
A: The form itself does not require any fees, but there may be other permit fees or costs associated with compliance requirements.

Q: What are the consequences of non-compliance with storm water discharge regulations?
A: Non-compliance can result in penalties, fines, and legal action. It can also have negative impacts on the environment and public health.

Q: How often do contractors and subcontractors need to submit Form 650-040-07?
A: The frequency of submission depends on the duration and scope of the construction activity, as well as any specific requirements outlined in the permit.

ADVERTISEMENT

Form Details:

  • Released on April 1, 2018;
  • The latest edition provided by the Florida Department of Transportation;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a fillable version of Form 650-040-07 by clicking the link below or browse more documents and templates provided by the Florida Department of Transportation.

Download Form 650-040-07 Contractor / Subcontractor Certification Npdes Generic Permit for Storm Water Discharges From Large and Small Construction Activities - Florida

4.6 of 5 (71 votes)
  • Form 650-040-07 Contractor / Subcontractor Certification Npdes Generic Permit for Storm Water Discharges From Large and Small Construction Activities - Florida, Page 1
ADVERTISEMENT

Related Documents