Instructions for DD Form 2617 Preparation of Engineering Release Record Utilizing

Instructions for DD Form 2617 Preparation of Engineering Release Record Utilizing

This document contains official instructions for DD Form 2617, Preparation of Engineering Release Record Utilizing , a military form released by the U.S. Department of Defense (DoD). An up-to-date fillable DD Form 2617 is available for download through this link.

FAQ

Q: What is the purpose of DD Form 2617?
A: The purpose of DD Form 2617 is to prepare an Engineering Release Record in the military.

Q: What is an Engineering Release Record?
A: An Engineering Release Record is a document used in the military to track changes and modifications made to equipment, systems, or processes.

Q: Who uses DD Form 2617?
A: DD Form 2617 is used by military personnel who are responsible for tracking and documenting changes made to equipment, systems, or processes.

Q: What information is included in DD Form 2617?
A: DD Form 2617 includes details such as the date, the nature of the change, the reason for the change, and any supporting documentation.

Q: How is DD Form 2617 prepared?
A: DD Form 2617 is prepared by filling out the required sections, including the necessary information about the change and any supporting documentation.

Q: Why is it important to use DD Form 2617?
A: Using DD Form 2617 ensures that changes and modifications made to equipment, systems, or processes are properly documented and tracked in the military.

Q: Is DD Form 2617 used outside the military?
A: No, DD Form 2617 is specifically used within the military for tracking and documenting changes and modifications.

ADVERTISEMENT

Instruction Details:

  • These 1-page instructions are available for download in PDF;
  • Released on June 20, 2018 - the latest version provided by the Executive Services Directorate;
  • Complete, printable, and free to use.

Download your copy of DD Form 2617 instructions by clicking the link below or browse more forms, instructions and templates in our library of DoD-released documents.

Download Instructions for DD Form 2617 Preparation of Engineering Release Record Utilizing

4.4 of 5 (24 votes)
  • Instructions for DD Form 2617 Preparation of Engineering Release Record Utilizing, Page 1
ADVERTISEMENT