DA Form 7805 Iindustrial Mobilization Capacity (Imc) Requirements for Manufacturing Facilities

DA Form 7805 Iindustrial Mobilization Capacity (Imc) Requirements for Manufacturing Facilities

What Is DA Form 7805?

This is a military form that was released by the U.S. Department of the Army (DA) on June 1, 2018. The form, often mistakenly referred to as the DD Form 7805, is a military form used by and within the U.S. Army. As of today, no separate instructions for the form are provided by the DA.

FAQ

Q: What is DA Form 7805?
A: DA Form 7805 is a form used to assess industrial mobilization capacity requirements for manufacturing facilities.

Q: What is Industrial Mobilization Capacity (IMC)?
A: Industrial Mobilization Capacity (IMC) refers to the ability of manufacturing facilities to support the production of military equipment during times of national emergency or conflict.

Q: Who uses DA Form 7805?
A: DA Form 7805 is used by the United States military to gather information about manufacturing facilities' capabilities and capacities for industrial mobilization.

Q: What information does DA Form 7805 collect?
A: DA Form 7805 collects information such as the facility's manufacturing capabilities, production capacity, available resources, and ability to rapidly expand production during a national emergency.

Q: Why is DA Form 7805 important?
A: DA Form 7805 is important for the military to understand the capacity of domestic manufacturing facilities and ensure readiness for industrial mobilization in times of national need.

ADVERTISEMENT

Form Details:

  • A 1-page document available for download in PDF;
  • The latest version available from the Army Publishing Directorate;
  • Editable, free, and easy to use;
  • Fill out the form in our online filing application.

Download an up-to-date fillable DA Form 7805 down below in PDF format or browse hundreds of other DA Forms stored in our online database.

Download DA Form 7805 Iindustrial Mobilization Capacity (Imc) Requirements for Manufacturing Facilities

4.6 of 5 (179 votes)
  • DA Form 7805 Iindustrial Mobilization Capacity (Imc) Requirements for Manufacturing Facilities, Page 1
ADVERTISEMENT