Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States)

Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States)

What Is Form EPD-APU?

This is a legal form that was released by the Georgia Department of Natural Resources - a government authority operating within Georgia (United States). As of today, no separate filing guidelines for the form are provided by the issuing department.

FAQ

Q: What is the EPD-APU Application?
A: The EPD-APU Application is a form used in Georgia to apply for a Letter of Concurrence to Install an Agricultural Water Withdrawal System.

Q: What is a Letter of Concurrence?
A: A Letter of Concurrence is a document issued by the Environmental Protection Division (EPD) in Georgia that grants permission to install an agricultural water withdrawal system.

Q: What is an Agricultural Water Withdrawal System?
A: An Agricultural Water Withdrawal System is a system used to withdraw water for agricultural purposes, such as irrigation or livestock watering.

Q: Who needs to fill out the EPD-APU Application?
A: Farmers or individuals planning to install an agricultural water withdrawal system in Georgia need to fill out the EPD-APU Application.

Q: What information is required in the EPD-APU Application?
A: The EPD-APU Application requires information such as the applicant's contact details, location of the proposed water withdrawal system, and information about the intended use of the water.

Q: Are there any specific requirements or regulations for agricultural water withdrawal systems in Georgia?
A: Yes, there are specific requirements and regulations that need to be followed when installing and operating an agricultural water withdrawal system in Georgia. It is recommended to consult the EPD and review the relevant guidelines and regulations for more information.

Q: How long does it take to process the EPD-APU Application?
A: The processing time for the EPD-APU Application can vary, but it typically takes several weeks to months for the application to be reviewed and a decision to be made.

Q: What happens after the EPD-APU Application is approved?
A: If the EPD-APU Application is approved, the applicant will receive a Letter of Concurrence from the Environmental Protection Division (EPD) in Georgia. This document grants permission to install the agricultural water withdrawal system.

Q: What should I do if my EPD-APU Application is denied?
A: If the EPD-APU Application is denied, the applicant may have the opportunity to address any deficiencies or concerns raised by the Environmental Protection Division (EPD). It is recommended to consult their office for guidance on next steps.

ADVERTISEMENT

Form Details:

  • Released on August 6, 2018;
  • The latest edition provided by the Georgia Department of Natural Resources;
  • Easy to use and ready to print;
  • Quick to customize;
  • Compatible with most PDF-viewing applications;
  • Fill out the form in our online filing application.

Download a printable version of Form EPD-APU by clicking the link below or browse more documents and templates provided by the Georgia Department of Natural Resources.

Download Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States)

4.4 of 5 (64 votes)
  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States)

    1

  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States), Page 2

    2

  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States), Page 3

    3

  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States), Page 1
  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States), Page 2
  • Form EPD-APU Application for a Letter of Concurrence to Install an Agricultural Water Withdrawal System - Georgia (United States), Page 3
Prev 1 2 3 Next
ADVERTISEMENT