U.S. Department of Agriculture - Rural Utilities Service Forms

The U.S. Department of Agriculture - Rural Utilities Service (USDA-RUS) is an agency that provides loans, grants, and technical assistance to rural communities in the United States. Its main purpose is to ensure that rural areas have access to reliable and affordable utility and telecommunications services, including electricity, water, wastewater, and broadband. The USDA-RUS helps finance the construction, improvement, and operation of infrastructure projects in rural America.

ADVERTISEMENT

Documents:

69

  • Default
  • Name
  • Form number
  • Size

This form is used for requesting changes to a construction project, including modifications to the scope of work, materials, or design.

This form is used for documenting the receipt of materials for a specific purpose in a RUS (Rural Utilities Service) project.

This Form is used for applying for headquarters facilities in Russia. Please note that this form is specific to the Russian Federation and is not applicable to other countries.

This form is used for the construction contract of electric systems in Russia. It applies to non-site specific construction projects.

This document lists the materials that are acceptable for a contract addendum. It specifies which materials can be included in the contract addendum and provides guidance for parties involved in the contract.

This document is a Contract Rider for RUS Form 282. It is used to add additional terms or conditions to a contract that is being submitted to the Rural Utilities Service (RUS) in the United States.

This document is a contract rider that can be used in conjunction with RUS Forms 515 and 773. It contains additional terms and provisions that can be added to the standard forms to tailor the contract to specific needs or requirements.

This form is used for summarizing completed construction projects in Russia. It provides a summary of the construction activities, costs, and completion status.

This form is used for assigning an engineering service contract in Russia. It specifies the terms and conditions of the contract, as well as the responsibilities and obligations of both parties involved.

This form is used for a special service contract for engineering services, specifically related to telephone services.

This form is used for adding an equal opportunity addendum to a document in the RUS system.

This form is used for assessing the qualifications of bidders participating in a procurement process. It helps evaluate if the bidder meets the required criteria to be eligible for the bid.

This form is used for tabulating the materials furnished by the borrower in RUS loans. It helps in keeping track of the materials that have been provided for the loan.

This form is used for recording and tabulating the materials provided by the borrower in the RUS (Rural Utilities Service) program. It provides a detailed document of the materials received and used for the project.

This Form is used for the final statement of cost for architectural services. It is a document that summarizes the total cost of architectural services provided.

This document is used for adding additional financing terms to a loan agreement for a construction project.

This form is used for a software license agreement in Russia. It outlines the terms and conditions for the use of a software product.

This Form is used for submitting a statement of engineering fees related to telecommunications services.

This form is used for making amendments to a construction contract in RUS (Rural Utilities Service). It includes changes to the terms, conditions, or scope of work.

This form is used for the final inventory of a telephone construction contract, including both labor and materials. It helps track and document all the items and costs associated with the project.

This document is used for keeping a final record of the inventory used in a telephone construction contract, including both labor and materials.

This form is used for obtaining a Certificate of Contractor and Indemnity Agreement in Russia. It is a legal document that outlines the agreement between the contractor and the party providing indemnity.

This Form is used for reporting the financial and operating performance of the electric distribution industry. It provides insights into the financial health and operational efficiency of electric distribution companies.

This document is used to provide information about financial requirements and expenses. It contains instructions on how to fill out RUS Form 595.

ADVERTISEMENT

This Form is used for supplemental information and requirements that need to be added to a construction contract.

Loading Icon