U.S. Department of Defense - Defense Contract Management Agency Forms

The U.S. Department of Defense - Defense Contract Management Agency (DCMA) is responsible for ensuring that contractors who do business with the Department of Defense (DoD) deliver high-quality products and services on time and within budget. The agency is responsible for managing and administering contracts, monitoring contractor performance, and providing contract-related support and advice to the DoD. DCMA plays a vital role in helping to ensure that the DoD receives the goods and services it needs to support our nation's defense.

ADVERTISEMENT

Documents:

21

  • Default
  • Name
  • Form number
  • Size

This Form is used for certifying plug and ring gauges used in the Naval Sea Systems Command (NAVSEA) 9243/1. It validates the accuracy and suitability of these gauges for use in various applications.

ADVERTISEMENT

This Form is used for certifying the major sub assembly of a propeller and propulsor.

ADVERTISEMENT

This Form is used for propulsor installation and certification in naval vessels. It ensures proper installation of propulsor systems and verifies their operational readiness.

ADVERTISEMENT

This form is used for certifying the propeller blade gage for the NAVSEA9245/14 model.

ADVERTISEMENT

This form is used for reporting visual inspections of the main propulsion shaft in a naval vessel to assess its condition and ensure proper preservation.

This document is a form used for the visual technical inspection of waterjet systems. It is used to report any observations or findings during the inspection process.

This document is used for performing dimensional inspections on propeller blades using the NAVSEA9245/13 form.

This form is used for reporting the visual preservation inspection of major sub assemblies of propellers and propulsors.

This Form is used for reporting and documenting the dimensional inspection of propellers used in naval equipment.

This Form is used for obtaining approval for alternate Arff/Hangar fire protection in accordance with the DCMA-AO requirements.

This document provides a guide for contractors on how to apply for an Arff Waiver.

This document provides guidance on obtaining a waiver for the use of a contractor's facility or hangar. It outlines the necessary steps and requirements for obtaining the waiver.

Loading Icon